Sepang Aircraft Engineering wins MRO contract with Cebu Pacific

where2life | 28 September 2026 | 0 | Happening Now , Travel , Travel Buzz

Sepang Aircraft Engineering (SAE), a wholly-owned subsidiary of Airbus, has signed a contract with Cebu Pacific of the Philippines, covering 12-year aircraft maintenance and end-of-lease (EOL) checks on seven A320 aircraft.

 

The announcement was made during the MRO Asia-Pacific event in Singapore, and the work will be undertaken at SAE’s facility at Kuala Lumpur International Airport between 2027 and 2028.

 

The latest agreement builds on the relationship between SAE and Cebu Pacific, which has seen  SAE previously conduct heavy maintenance and ad hoc EOL checks, aircraft engine changes, and skin panel replacement work for the airline.

 

In addition, SAE has on occasion supported Cebu Pacific’s maintenance needs, by deploying a team of engineers to perform on-site work on the carrier’s fleet in Manila.

 

“SAE and Cebu Pacific have developed a strong collaborative relationship,” said Burhanudin Noordin Ali (Burhan), General Manager of SAE and Airbus Country Representative for Malaysia. “This latest agreement is a clear sign of trust and confidence placed by the carrier on the work we do. We appreciate Cebu Pacific’s continued support for SAE.”

 

Shevantha Weerasekera, Vice President for Engineering and Fleet Management of Cebu Pacific, said: “Ensuring the safety, airworthiness, and reliability of our fleet remains fundamental to how we operate at Cebu Pacific. Our continued partnership with Sepang Aircraft Engineering provides us with trusted MRO expertise to support the maintenance and airworthiness of our A320 fleet. As we prepare the aircraft for return to its lessor, working with experienced maintenance partners allows us to ensure that the aircraft is maintained to the required standards and remains in optimal condition for a smooth and efficient redelivery.”

 

SAE specialises in the MRO of commercial aircraft, engines and components. It has two hangars with a combined area of some 50,000 square metres located within the grounds of Kuala Lumpur International Airport (KLIA), and is able to accommodate up to eight aircraft at any one time for major maintenance checks.

Related Posts

Leave a Reply

Your email address will not be published. Required fields are marked *

Advertisement

Download e Magazine

Categories

Recent Posts

Archives

Video